spot_imgspot_imgspot_imgspot_img
Saturday, November 21, 2026
spot_imgspot_imgspot_imgspot_img
HomeNationalFG suspends pedestrian bridge work after 20-hour Lagos–Ibadan gridlock

FG suspends pedestrian bridge work after 20-hour Lagos–Ibadan gridlock

The Federal Government has indefinitely suspended construction of a pedestrian bridge at Aseese on the Lagos–Ibadan Expressway after a traffic jam left motorists stranded for more than 20 hours.

The project, being handled by the Federal Ministry of Works in partnership with CBC Construction Company, was scheduled to run from Wednesday, November 18, to Sunday, November 22. The work was intended to facilitate the installation of the bridge.

Before the exercise began, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) announced a temporary diversion for traffic heading towards Lagos. Motorists were to move onto the Lagos carriageway at Aseese and rejoin their usual route at a designated exit opposite Christ Embassy.

The diversion, however, led to severe congestion. The gridlock began at about 2pm on Wednesday and continued until around noon on Thursday, leaving motorists and commuters stranded for hours. Some passengers had to walk long distances to reach their destinations.

PUNCH Metro reported that some commuters who left Ibadan shortly after 11am did not reach Magboro until about 5.30pm. One motorist said a trip from Mowe to Magboro took eight hours. Frustrated by the delays, many drivers abandoned their vehicles and continued on foot.

Commercial motorcycle operators also raised their fares. One rider reportedly demanded as much as N6,000 from a passenger travelling from Mowe to Ibafo. The congestion worsened as some drivers attempted to escape the jam by driving against traffic.

On Wednesday night, the Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, criticised the timing of the construction. In a Facebook post, he said thousands of commuters had been caught in the gridlock, with some forced to leave their vehicles and walk home. He questioned why the contractor had not scheduled the work for a period when traffic was lighter.

Dare wrote: “Tonight – Lagos-Ibadan Expressway. I have been in a traffic gridlock for over five hours trying to get out of Lagos to Ibadan for multiple radio and television appearances ahead of the APC Presidential Rally coming up on Saturday in Ibadan.

“It beats me why a Chinese Contractor would choose the busiest hours of vehicular traffic to construct the bridge and road around this exit point. Stranded cars, thousands of people trekking to get home.

“What happened to doing construction work during the obituary hours when traffic is lean? This is unnecessary pain. It needs to be corrected.”

Other road users also shared their experiences on social media. Facebook user Adiatu Adeoye wrote that her truck had spent 12 hours in the gridlock. Ojewale Adewale said he arrived at the Interchange from Abeokuta at 3pm while travelling to Lagos, but did not get home until 9.59pm.

Kemi Adewuyi said she encountered the traffic on her way home from work and again the following morning. She also complained about paying N500 for a trip from Car Park C to Mowe bus stop.

Our correspondent, who monitored the situation on Thursday, observed that the gridlock had continued overnight and into the afternoon. Some commuters abandoned their journeys after commercial drivers raised fares from the usual N700–N800 to as much as N3,000 for trips between Mowe and Berger. Motorcyclists reportedly charged up to N5,000 for the same journey.

Traffic began to ease at about noon on Thursday, and movement was restored along the affected stretch of the expressway.

Following the disruption, TRACE announced that the construction work had been suspended indefinitely. The agency said the decision followed the traffic difficulties experienced along the corridor from Wednesday through Thursday morning and that the traffic-management arrangements for the project would be reviewed.

TRACE spokesperson Babatunde Akinbiyi said: “Consequently, all motorists are hereby advised that the temporary traffic diversion associated with the pedestrian bridge construction is suspended, pending further directives from the relevant authorities.

“TRACE regrets the inconveniences, delays and discomfort this development may have caused motorists and other road users. We sincerely appreciate the patience, understanding and cooperation of the motoring public.”

The acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, also confirmed by telephone on Thursday that work had been suspended because of the traffic situation.

Meanwhile, some road users called for the repair of inner roads connected to the expressway, saying they could provide alternative routes during major traffic disruptions. Commuter Kunle Adeleke said well-maintained local roads would have given motorists other ways to avoid the congestion, and urged the Ogun State Government to fix them.

Another commuter, Jamiu Akinsola, called on the Federal Government to strengthen its oversight of contractors working along busy corridors to prevent a similar disruption.

Infrastructural development is good, but the welfare of the people must be taken into consideration,” he said. “The FG must call its contractors to order and inform them to put the wellbeing of citizens first. We should be doing better than this at this stage of our national development.

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -spot_imgspot_imgspot_imgspot_img

Most Popular

Join our WhatsApp Group